PUYANG ZHONGSHI GROUP CO.,LTD
PUYANG ZHONGSHI GROUP CO.,LTD
Home > Zhongshi News

How To Install Bow Spring Centralizer

May. 10, 2018

The installation distance of the casing centralizer should meet the requirements of the construction design. The selected outer diameter of the centralizer should be determined according to the wellbore.

Placement method:

1. Can be directly put on the sleeve.

2. It can be installed to move freely between casing coupling and coupling.

3. Can be installed in any part of the casing with a retaining ring.

When installing, the centralizer is buckled on the casing. After the hoop, the two pins are inserted into the upper and lower pins, and the locking pin is flattened or the pin is bent to prevent the pin from exiting and being checked into the well after being checked.

We are a professional Chinese supplier of Oil machinery. Our products include: Composite Centralizer, Cement Float Collar Float Shoe, etc. If you have any questions about our products, please feel free to contact us.

Cement Float Collar Float Shoe

Hot Products

CONTACT US
  • E-mail:
    sales@pyzs-group.com
  • TEL:
    +86 22 2345 6997
  • Address:
    Mazhuangqiao Industry Zone, Puyang City, Henan Province, China.
Follow us
  • Copyright © Puyang Zhongshi Group Co., Ltd. All Rights Reserved
  • Sitemap
  • Technical Support:
Online Services
1